Is this floating oil refinery capable of meet 10% of our demand and commissioned in 2018,operational?

This is the Egina FPSO. It was built by Samsung Heavy Industries (SHI). The FPSO was constructed in South Korea and arrived in Lagos in October 2017. Commissioned in 2018.It is located 150 kilometres off the coast of Nigeria at water depths of 1400-1700 meters. The cost of building the Egina FPSO was around $16 billion,(entire project including oil field development) with various contracts awarded to different companies. It is 330 meters long, 61 meters wide, 34 meters high and weighs 47,500 tons. The floating production, storage and offloading vessel (FPSO) has an oil storage capacity of 2.3 million barrels.The production capacity of the FPSO vessel is 208,000 barrels of oil daily. The partners in the field development include Total Upstream Nigeria (24%), CNOOC E&P Nigeria (45%), Sapetro (15%) and Petrobras Oil and Gas (16%). The facility is preferred in the offshore industry as it is easy to install and does not require pipelines to export oil and gas./Akparawa Sunny Tom on FB

Sponsored

Sponsored Images


Dear Readers, Good and credible news reportage is tedious task and requires huge finances.

We are soliciting your Noble support for as low as N1,000 your support would go a long way in assisting us to continue to guarantee our readers quality news.
Bank transfers can be made to:
Account Name: Harvest and Commercial
Bank: Sterling Bank
Account Number: 0078627735